The refurbishment of the Movenpick Hotel in Al Quseir spanned over 5 phases. It included renovations to the existing bar/lounge, reception, spa, pool area, and a restaurant.
CLIENT:,CLIENT:,CLIENT:MOVENPICK Hotel and Resort El Quseir
CONSULTANT:,CONSULTANT:,CONSULTANT:ZERO 31 Design Studio